📋 Tender Overview
Project Description : Annual funding for the rehabilitation and replacement of sidewalks.
The Budget amount of $150,000 will allow for the replacement of approximately 0.72 km of sidewalk annually. This base amount is increased by CPI annually to reflect the expected cost in future years to continue to address approximately .72 km of sidewalk annually. While this amount falls short of the amount recommended to be replaced annually, as noted below, it does allow for the program to begin to start to address this challenge. The Town has approximately 60 kilometres of sidewalks: - 56.5 km are concrete - 5.8 km are interlock bricks including Kings Navy Yard - 0.5 km are asphalt The life expectance of a concrete sidewalk ranges from 10- 25 years. For this application, the lifecycle value is 25 years. Therefore, approximately 2.18 km of concrete sidewalk should be replaced yearly. The majority of the sidewalks are 1.2 m (4ft) wide and there are a few sidewalks that are less than 1.2 m. The AODA requires sidewalks to a minimum width of 1.5 metres. In addition to width, AODA standards require tactical plates to be installed in ramped intersections. Therefore, in order to improve the Town’s Sidewalk Infrastructure, Roads Division is recommending the following budget considerations: - Completing approximately 2.18 kilometres of concrete sidewalks annually in order to replace and update the aging infrastructure. - Create a new initiative to complete intersections and crossing locations to meet the standards in the AODA. Based on the information and data on our sidewalks, the recommended level of annual funding and replacement is: 2.18 km of Sidewalk Replacement - $327,000 AODA Intersection Improvements - $50,000 Commencing in 2023 with base funding of $125,000, increased annually by CIP to address .72kms will make progress towards this need. 2024 - $150,000 2025 - $175,000 2026 - $200,000 2027 - $225,000 2028 - $250,000