📋 Tender Overview
ScopePhase 1A Segment A of the Seven Corners Ring Road Improvements project includes the construction of a portion of the Seven Corners Ring Road from Arlington Blvd Route 50 Westbound Ramp to the intersection of Castle Place and Sleepy Hollow Road with eleven-foot travel lanes a twelve-foot bi-directional cycletrack and eight-foot parking lanes. The existing Seven Corners Interchange is a confusing confluence of major roads Arlington Blvd Route 50 Leesburg Pike Route 7 and Wilson BlvdSleepy Hollow Road multiple signalized intersections extremely limited pedestrian facilities and no bicycle facilities. The Seven Corners Transportation Study Phase II November 2014 identified that most of the intersections at the Seven Corners Interchange operate at level of service E or F during peak periods due to the convergence of several regional commuting corridors at a single point. The interchange causes high levels of congestion long periods of vehicular delay and safety concerns for pedestrians bicyclists and transit users. This project application is to design the first phase of the new Seven Corners Interchange