Project Context CTG Brasil is a large power generation group in Brazil, with a total installed capacity of 8.3 GW including 17 hydroelectric power plants, 5 groups of wind farms, and 1 solar plant spread across eleven states in Brazil. In November 2023, CTG Brasil was awarded for the fourth consecutive year, with the gold seal of the Brazilian GHG Protocol Program, a national reference for measuring and managing greenhouse gas (GHG) inventories. As part of the strategy, CTG Group plans to increase further renewable energy generation capacity and will contribute to the diversification of the sources of electricity supply in Brazil.
Project Description NDB will finance the construction of the Serra da Palmeira power project, a 648-MW wind power project in the State of Paraรญba, Brazil. The Project, with wind turbine generators to be imported from China, showcases increasing cooperation among NDB member countries. The Projectโs associated facilities include the construction of a 34.5/500-kV private substation and a 75-km long 500-kV transmission line connecting the Project to the Campina Grande III substation, which is the interface with the national grid.
Project Objective The Project will contribute to the expansion of Brazilโs renewable energy capacity and the diversity of the countryโs overall power matrix. Investments in the Project will bring economic benefits to an underdeveloped Paraรญba State area in northeast Brazil. The Project contributes towards diversification of economic activities in the region, employment generation, and increased tax revenues for local government, along with social programs introduced by CTG Brasil for local communities.