Renewable Energy Consultancy Infrastructure and construction

Seminoe Pumped Storage Tender

🏛️ RPLUS ENERGIES
📄 Tender ID: 486204682 📅 Published: 23 Mar 2023

📋 Tender Overview

Scope The Seminoe Pumped Storage project is a planned reservoir-based energy storage project that will be located in Wyoming the US. The project will be the first pumped hydro storage project in the state.Currently the project is in design and permitting phase.Black Canyon Hydro a subsidiary of project developer rPlus Hydro is the licence applicant for the Seminoe Pumped Storage project.According to the Final License Application construction works may start in October 2026 after securing the licence and completion of land lease purchase agreements. Commercial operations are expected to begin in 2031. The cost of construction is estimated to be 2.5bn.Once complete the project will with a generating capacity of up to 900MW.Location and InfrastructureThe Seminoe Pumped Storage project will be located in Carbon County Wyoming.The site around 35miles northeast of Rawlins in Wyoming was selected as it meets all requirements for a pumped storage project.A typical pumped hydro energy storage project has two water reservoirs at different elevations. Such facilities generate and store electricity by moving water between the two reservoirs.The Seminoe project will have two such reservoirs three variable pump-turbine units in an underground powerhouse groundwater wells and a connection to the existing electric transmission grid.The projects facilities will create an open loop hydraulic arrangement. The existing Seminoe Reservoir which has a water storage capacity of nearly one million acre-ft will be used as the lower reservoir for the project.Key construction works will involve building the above-ground reservoir and a nearly 30-mile transmission line for the project.The above-ground reservoir will be located in the Bennet Mountains around 1.7 miles east of the Seminoe Dam around 1000ft higher than the Seminoe Reservoir.The upper reservoir will be constructed as a roller-compacted concrete RCC water-retaining perimeter structure. The crest of the RCC water-retaining structure will be at an elevation 7455ft.The two reservoirs will be joined by underground tunnels while underground powerhouse will host the pump-turbine units to generate power from water flow.The same equipment in the powerhouse will also pump water from the lower reservoir back to the upper reservoir to restart the cycle.The machine hall will also have three generator-motors and unit spherical shut-off valves upstream of the pump-turbines control room stores and other systems for the general functioning of the plant.When the process will start with a full upper reservoir the plant would be capable of providing full power output for ten hours before recharge.The project is expected to create up to 500 high-skilled construction jobs over three to five years. Once operational the project will employ 35 people in full-time skilled positions.Power EvacuationThe power generated b

🔍 Key Information

📄
Tender Reference No.
486204682
📅
Publication Date
23 Mar 2023
💰
Estimated Value
USD 2500000000
🌐
Sector
Renewable Energy
📅
Deadline
30 Sep 2031
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
8 Years 6 Months 7 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
1779
days remaining · 30 Sep 2031
🔔 Set Alert

🧭 Quick Facts

Authority RPLUS ENERGIES
Country United states
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…