laboratory equipment and services Renewable Energy

Seawater Hydraulic Pto Tender

πŸ›οΈ WAVEPISTON AS
πŸ“„ Tender ID: 507362367 πŸ“… Published: 20 Aug 2024

πŸ“‹ Tender Overview

Seawater Hydraulic Pto Using Dynamic Passive Controller For Wave Energy Converters
Cost-Efficient Wave Energy Conversionharnessing The Immense Power Of Ocean Waves For Renewable Energy Has Long Been An Exciting Prospect, Yet Practical Implementation Has Proven Elusive. Existing Wave Energy Converters Often Struggle To Capture Power Efficiently, Leading To High Costs And Limited Effectiveness. Moreover, Many Control Strategies Focus Solely On Power Maximisation, Neglecting The Crucial Factor Of Cost Efficiency. In This Context, The Eu-Funded Shy Project Focuses On Developing A Composite Linear Pump And Controller Valve That Use Seawater As The Working Fluid. What Sets Shy Apart Is Its Use Of A Dynamic Passive Controller, A Cutting-Edge Approach That Maximises Power Capture Without Requiring Additional Reactive Energy. This Not Only Increases Efficiency, But Also Improves The Affordability Of Energy.
Funded Under
Climate, Energy And Mobility
Total Cost
€ 0,00
Eu Contribution
€ 3 811 110,32
Coordinated By
Wavepiston As
Denmark
Start Date
1 April 2024
End Date
31 March 2027

Objective

The SHY project will develop a composite linear pump and controller valve that use seawater as the working fluid and enable the use of a dynamic passive controller to maximise the power capture. A dynamic passive controller involves the dynamic control of active energy, i.e. only damping forces. This has been shown to provide a significant increase in power capture relative to optimum linear damping without the requirement to provide additional reactive energy. The performance of this control strategy and associated technologies will be proven by applying it to the Wavepiston wave energy converter; however, it is expected to be equally suitable for a wide range of wave energy converters that utilise a hydraulic PTO. A numerical model of the system will be constructed and used to develop a control strategy designed to minimise the levelized cost of energy, rather than maximise power capture, which is a common, but sub-optimal, objective for many control strategies. The control strategy will first be calibrated and validated using a hardware-in-the-loop test programme and subsequently validated using the Wavepiston offshore test bench at PLOCAN. Two generations of the linear pump and controller valve will be fabricated, designed for mass production with consideration of its full lifecycle impacts (although the actual prototypes may use low volume techniques to limit project costs). The second generation prototypes will be based on learning from experiences and the performance of the first generation. A condition controller designed to increase the remaining useful life and thus reduce the LCOE will also be investigated. This will include identifying condition signatures that indicate a deterioration in one or more components and then using this signature to first estimate the remaining useful life followed by identification of modifications to the contr

πŸ” Key Information

πŸ“„
Tender Reference No.
507362367
πŸ“…
Publication Date
20 Aug 2024
πŸ’°
Estimated Value
N/A
🌐
Sector
laboratory equipment and services
πŸ“…
Deadline
31 Mar 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Denmark
πŸ“‘
Contract Duration
2 Years 7 Months 11 Days

πŸ“ Documents & Downloads

View All Documents β†’
# Document Name Type Action
2
T507362367.html
HTML

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
151
days remaining Β· 31 Mar 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority WAVEPISTON AS
Country Denmark
State / UT N/A
Tender Type Project Information
Currency DKK
Similar Tenders
Loading similar tenders…