📋 Tender Overview
Project Description : This program is to provide for clarity on all of the planned sanitary sewer upgrades and replacements Town wide. It is comprehensive listing of all aspects of the project, including any work required for water, storm, road and or other infrastructure costs included as part of the whole project.
2024 - River Canard Pump Station - $60,000 The current generator is located in a small building that was constructed in the early 1980’s. This request will eliminate the building and replace the generator with an outdoor unit & outdoor control panel similar to what has been installed within the Amherst/Bar Point sewer systems. - $140,000 was approved during the 2023 budget deliberations. Additional review has identified that additional funding is required for this project to relocate the hydro service from overhead to underground. If funding is approved the work will commence in 2024. 2025 - $150,000 Richmond Street sewer replacement – Fryer to States: $150,000 Engineering study to address the recommended sanitary sewer analysis for Civica. This section of sewer was identified for increased capacity to assist in relieving sanitary sewer surcharging. The engineering study for the project will include watermain replacement and road rehabilitation requirements. 2026 - $1,875,000 Richmond Street sewer replacement – Fryer to States: $1,700,000 Estimated construction costs for this project will be revisited as the work in the engineering study is completed to provide more clarity on actual scope of work. Costs estimates included in 2026 are to ensure there is some funding identified so that the construction stage can commence soon after completion of the study. This project will include watermain replacement and road rehabilitation Sewer Component - $600,000 Water Component - $600,000 Roads Component - $500,000 Brock Street Sewer Replacement – Richmond to Kempt - $175,000 Engineering design to replace the vitrified clay sewer on Brock Street. This section of sewer is identified in the now category in the Towns asset management database. The engineering study for the project will include watermain replacement and road rehabilitation requirements. 2027 Brock Street Sewer Replacement – Richmond to Kempt - $675,000 Estimated construction costs for this project will be revisited as the work in the engineering study is completed to provide more clarity on actual scope of work. Costs estimates included in 2026 are to ensure there is some funding identified so that the construction stage can commence soon after completion of the study. This project will include watermain replacement and road rehabilitation Sewer Component - $300,000 Roads Component - $375,000