📋 Tender Overview
Description:San Rafael: San Rafael Transit Center: The SMART extension will bisect the existing transit center, eliminate Platform C,
reduce the facility's transit capacity, and affect the long-term efficiency and operability of the facility. Phase 1 of the project
will analyze three previously identified potential long-term alternatives and a no-build alternative, include an option to
assess the possibility of additional alternatives, conduct community outreach and environmental clearance, and provide
preliminary engineering design. When SMART commences service on their Initial Operating Segment in 2017, the SRTC
will be operating in an interim condition which will limit the fiscal and operational efficiency of transit services. Phase 2 will
complete final design and construction of the permanent San Rafael Transit Center. 21-T-01-002