📋 Tender Overview
Scope of WorkSan Diego International Airport Terminal 1 Gate Replacement.DescriptionSan Diego International Airports 1960s-era Terminal 1 will be replaced with a 30-gate facility more than triple the current size under a 3 billion redevelopment plan approved by the airports governing board. While much remains to be done before construction could get underway late next year including hiring a contractor and securing California Coastal Commission approval airport officials believe the first stage of the new terminal could open by 2024. Full completion of all 30 gates 11 more than the existing 19 is expected two years later.The airlines and the fees they pay for renting terminal space plus revenues from parking concessions and passenger facility charges will pay for the costly project. Southwest Airlines the largest of the airports air carriers operates out of Terminal 1. An entirely new 1.2 million-square-foot Terminal 1 that will be on par with the renovated and expanded Terminal 2 project completed in 2013. Aircraft arrivals and baggage claim will be on the lower level with ticketing security screening seating areas and concessions on the upper level. A new 5500-space parking garage. Relocation of the existing taxiway and construction of a second taxiway to allow for easier movement of arriving and departing aircraft.A reserved site for a future transit station if and when a people mover or an extension of the San Diego trolley is brought to the airport. A new three-lane airport access road from Laurel Street and North Harbor Drive that airport planners say would remove 45000 vehicle trips per day from Harbor Drive. The airport will also reserve right-of-way for a future three-lane outbound roadway. A new administration building on the far west side of the airport that will replace the current offices now located in the former commuter terminal. A free shuttle service between the Old Town transit center and the airport.