📋 Tender Overview
Scope of Work:
Salinas Area Reinforcement Project.
Description:
The Salinas-Spence 60 kV system located in Monterey County is supplied from the Salinas 115 kV bus via two stepdown transformers that also feed other lines out of Salinas substation. The Salinas-Spence 60 kV system consists of two 60 kV paths. One is the Salinas-Firestone 60 kV and Firestone-Spence 60 kV lines. The second path is the Salinas-Spence 60 kV line that passes through Sanborn junction and serves the Industrial Acres Substation. Buena Vista, Industrial Acres, and Spence are three PG&E distribution substations supplied from the Salinas-Spence 60 kV system along with two small transmission load substations, Fresh Express and Firestone. South of Spence substation, the 60 kV lines Soledad #1 and Soledad #2 extend toward Gonzales and eventually Soledad and are normally open at Spence. PG&E Distribution Planning has received a large number of load interconnection applications near Spence. The major load growth has been modelled at Spence substation, which is forecasted at 23.3 MW in 2023, 50.8 MW in 2025, and 84.6 MW in 2035. However, due to space limitations, Spence substation is limited to two 30 MVA distribution transformers and capable of serving only up to 60 MVA load. A limited amount of projected load can be supplied out of Gonzales, however, this would warrant potential upgrades at Gonzales in near future. The project has the estimated cost of $226.1M - $452.3M and the expected in-service date of December 2035.