📋 Tender Overview
Description : Road section 105 was paved in 1996 with 50mm HL-4 of asphalt at a cost of $24,890. Based on a 2018 inspection, this section maintained a Street Condition Rating of 6.0 in comparison to the 2013 rating. This road section was included in the 2018 Road Management Study as needing a rural paving on 50mm HL-4 for 40 metres. The work currently being proposed includes pulverize existing asphalt, drainage improvements, and new base asphalt.