📋 Tender Overview
Project : ENG-002-14
Project Description : - This project is the continuation of the block retaining wall along the south limits of the new Festival Plaza between Riverside Drive and the Festival Plaza. Phase 1 of retaining runs from Glengarry to McDougal was completed in 2019/2020. The remaining wall will run from McDougal to Vane Udine Cr. The remaining portion of this retaining wall will provide stabilization for the roadway along riverside drive and will allow of a multiuse walkway to continually run along the length of Riverside Drive as per the Vista Riverside Drive Improvement Project.