📋 Tender Overview
Project Description: The Rivard Line over Toulouse Pumping Works Culvert Replacement Project consists of replacement of the existing concrete culvert including wingwalls and footings. This project includes installation of a new concrete box culvert, extending the culvert ends with sloped rip-rap erosion protection, maintaining existing field and driveway accesses, reroute drainage piping through culvert walls or to outlet beyond culvert ends, reinstate asphalt road surface and extend shoulders over crossing. This project will be in the design stage in 2025 with anticipated tender between July and September 2025, with the 2-year construction timing window beginning January 2026 until December 2027.