Infrastructure and construction

Relocation Sandpoint Beach Tender

🏛️ CITY OF WINDSOR
📄 Tender ID: 491593111 📅 Published: 21 Jul 2023

📋 Tender Overview

Project : REC-002-14

Project Description : - On March 4, 2013 Council approved B3/2013 "That the report from the Executive Director of Recreation and Culture regarding the provision of lifeguards at Sandpoint Beach BE RECEIVED and further that the reinstatement of funds for the lifeguards in the amount of $60,272 in the 2013 operating budget as part of the base budget BE APPROVED, and further, that the option of moving the beach further east on the property BE REFERRED to future Capital Budget deliberations". Included in the March 4, 2013 report was information on the audit of Sandpoint Beach by the Lifesaving Society. Regarding the location of the beach, the Lifesaving Society audit included the following: Primary Recommendation Number 6 – Restrict access to the western edge of the supervised beach. The recommendation states in part, Beach and water access to the western edge of the beach should be restricted. The City may also want to consider closing this beach in favour of moving it further eastwards. At a minimum, beach patrons should be restricted from accessing this area of the beach by installing additional fencing which will reduce the designated beach area. Amenities currently at the beach include a play ground, sand volleyball court, picnic tables and a kayak/wind surfing launch area. The redevelopment would move Sandpoint Beach further east on the property. With this option, the existing beach at the western location would be renovated and converted to land use only, including shoreline improvements that would serve to discourage access to the water in this section. The public beach access would be moved further east and would be smaller in size than the current beach. The opportunity exists at Sandpoint Beach to create a master plan for future development that will take advantage of this valuable asset on the waterfront. Additional engineering consultation would be required from a number of regulatory bodies for a full scope. For example, a new groin may be required depending on the currents to trap sand in order to facilitate retention of sand at the new location. It may be possible to phase this project, with the first phase providing functional amenities, and additional phases providing amenities to enhance the use of the park. Relocation of Sandpoint Beach is projected to require over $10M in funding.

🔍 Key Information

📄
Tender Reference No.
491593111
📅
Publication Date
21 Jul 2023
💰
Estimated Value
N/A
🌐
Sector
Infrastructure and construction
📅
Deadline
31 Dec 2030
📝
Notice Type
Projects
📍
Location
Canada
📑
Contract Duration
7 Years 5 Months 10 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
1506
days remaining · 31 Dec 2030
🔔 Set Alert

🧭 Quick Facts

Authority CITY OF WINDSOR
Country Canada
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…