Maximum grant amount from JICA : 2,720 million yen
Planned implementation period : 40 months, including detailed design work and the bidding period
Specific project details (provisional) :
1 Facility improvements
Reconstruction of Faranah Bridge (70 m long, 17 m wide (two lanes [including a motorcycle lane], sidewalks on both sides), an access road (approximately 503 m) connecting to both ends of the bridge, relocation of existing utilities (electricity, water, internet cable [fiber optics]).
2 Consulting services
Detailed design work, bidding assistance, construction/procurement supervision.