Scope of Work:
Construction of 225-MW pumped-storage hydropower plant at a closed oil shale mine in Estoniaโs Ida-Viru County.
Description:
The final size and profitability of the investment will be determined once Eesti Energia finalises the preliminary design and the environmental impact assessment. The plan includes building the plantโs upper reservoir on a waste rock structure, and using the closed mine as the lower reservoir. The height between the two reservoirs will be increased by reusing waste rock from the enrichment process of rock mass from oil shale mining. The project is unique because, as far as Eesti Energia is aware, oil shale or coal mines have not been used as water reservoirs for hydroelectric power plants.
The facility will be Estoniaโs first pumped-storage hydroelectric power plant. Once in operation, it will contribute to the countryโs energy security after desynchronization from the Russian energy system. In view of the connection to the continental European electricity system planned for 2026 at the latest, it is extremely important that the necessary energy markets and production or storage assets are created in the Baltic States to ensure the security of supply as greenly and cheaply as possible. Eesti Energia expects that have the plant up and running in 2026.
Events:
August 2022-Estonian state-owned energy company Eesti Energia AS has started making plans to build an up to 225-MW pumped-storage hydropower plant at a closed oil shale mine in Estoniaโs Ida-Viru County.
Financing Sources:
2) KredEx
Salarpuria Softzone, Ground floor, Wing 'A', Tower A, Dr Puneeth Rajkumar Rd, Bellandur, Bengaluru, Karnataka 560103, India