Industry Environment and Pollution

Prime Manufacturing Crystal Tender

πŸ›οΈ BORMIOLI ROCCO SPA
πŸ“„ Tender ID: 488745273 πŸ“… Published: 24 May 2023

πŸ“‹ Tender Overview

The PRIMUS project will deliver an innovative combination of crystal glass furnace technologies to improve energy efficiency and reduce GHG emissions. The innovations will include furnace electrification, and an innovative waste heat recovery solution related to the furnace channels, regenerative burners and the exhaust furnace gas. The project will be developed in the Fidenza plant in Italy and will contribute to the decarbonisation of the production of high-quality crystal glass, through the electrical hybridisation and energy efficiency measures. Among the outcomes of the Bormioli Rocco solution is a significant reduction of GHG emissions, with an expected relative emission reduction of about 28% compared to the reference scenario. The PRIMUS project aims to create a lower emission plant capable of producing a large quantity of high-quality crystal glass for the tableware market. This will be achieved using a highly efficient hybrid furnace in combination with an innovative waste heat recovery solution to improve the energy efficiency of the site. The project will be the first application of hybridisation in this specific sector. Electrodes will be used in the furnace, allowing part of the fuel to be substituted with electricity. This will result in a significant reduction in direct methane consumption, and therefore in a remarkable cut to the emissions of the plant. GHG reduction is also achieved due to the waste heat recovery system and the use of regenerative burners in the channel section of the plant. The ceramic heat regenerators enable the recovery of 85-90% of heat from the waste gases and a fuel consumption reduction of up to 45%. This represents a first-of-a-kind application of this technology in the glass sector, optimising the energy efficiency of combustion. As well as the regenerative burners, a waste heat recovery system from the exhaust furnace gases will be installed. This will allow a major reduction to the methane consumption in the plant, which is used for the heating and hot water production. Two of the main pillars of the decarbonisation pathway are efficiency and electrification. Across the whole plant, PRIMUS uses these pillars to cut CO2 emissions from methane combustion from 6.8 to 2.6 tonnes CO2equivalent, per year, equating to a 61% reduction. This is a remarkable result for such a hard-to-abate sector. In this way, over the first ten years of operations, the plant will have an absolute GHG reduction of about 42 000 tonnes CO2 equivalent. Scalability is embraced by the PRIMUS project at all levels. The hybrid furnaces and the waste heat recovery systems can be replicated in other plant furnaces and in the other regional methane fuelled glass furnaces. The scalability of the PRIMUS project is also projected to have significant impact on the European crystal glass tableware production sector. It has been evaluated that, over a period of 10 years, the implementation of PRIMUS technologies in the revamping of glass in

πŸ” Key Information

πŸ“„
Tender Reference No.
488745273
πŸ“…
Publication Date
24 May 2023
πŸ’°
Estimated Value
N/A
🌐
Sector
Industry
πŸ“…
Deadline
31 Jan 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Italy
πŸ“‘
Contract Duration
3 Years 8 Months 7 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
90
days remaining Β· 31 Jan 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority BORMIOLI ROCCO SPA
Country Italy
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…