Nukus 200mw Wind Tender

πŸ›οΈ ACWA POWER BERUNIY WIND FE LLC
πŸ“„ Tender ID: 515720813 πŸ“… Published: 12 Mar 2025

πŸ“‹ Tender Overview

STATUS
Proposed
MEMBER
Uzbekistan
SECTOR
Energy
E&S CATEGORY
Category B
PROJECT NUMBER
000905
FINANCING
PROPOSED FUNDING AMOUNT
USD80 million
FINANCING TYPE
Nonsovereign
TIMELINE
CONCEPT REVIEW
July 25, 2024
OBJECTIVE
To increase the renewable energy generation capacity through the construction of a 200MW wind power plant and 100MWhr Battery Energy Storage System in the Republic of Uzbekistan.

DESCRIPTION
The project involves the development, construction, and operation of a wind power plant of 200MW capacity, a 100MWhr Battery Energy Storage System (BESS), expansion of a 220kV switching station and 2x42 km double circuit 220kV Overhead Transmission Line (OHTL) connecting to an existing grid substation. The proposed project site is in the Karatau mountain region in Beruniy and Qorao'zak Districts in Karakalpakstan, Northwestern Uzbekistan.

A 25-year PPPA has been awarded to ACWA through a competitive tender and signed on March 28, 2024, with the National Electric Grid of Uzbekistan (NEGU) as the Public Partner (off taker). A project SPV – Private Partner (ACWA Power Beruniy Wind FE LLC) has been established and will serve as the borrower for the respective plant.

ENVIRONMENTAL AND SOCIAL INFORMATION
Applicable Policy and Categorization. AIIB’s Environmental and Social Policy (ESP), including the Environment and Social Standards (ESSs) and the Environmental and Social Exclusion List (ESEL), will apply to this Project. ESS 1 (Environmental and Social Assessment and Management) and ESS 2 (Involuntary Resettlement) are applicable to the ES aspects of the Project. The Project includes development of wind turbines, battery energy storage system and 220 kV overhead transmission line (OHTL), Category B is assigned as the Project will have a limited number of potentially adverse environmental and social impacts during construction and operation phases. Asian Development Bank (ADB) is considering participating in the financing as a senior lender (project finance) and they have categorized as B for environment and B for involuntary resettlement.

Environmental and Social Instruments: The client has prepared an Environmental and Social Impact Assessment (ESIA) including Environmental and Social Management Plan (ESMP), non-technical summary of the ESIA (NTS), stakeholder engagement plan (SEP) and is currently finalizing the Land Acquisition and Livelihood Restoration Plan (LALRP). Critical Habitat Assessment (CHA) for the Project has been carried out and biodiversity management measures have been prepared. Lenders’ Environmental and Social Advisor (LESA) hired by the Project carried out environmental and social due diligence (ESDD) and reviewed the project ES documents as well as the client’s ES management capacity. The ESDD report and draft environmental and social action plan (ESAP) prepared for the Project will be finalized before the Project approval.

Environmental Aspects: The environmental impacts linked with the con

πŸ” Key Information

πŸ“„
Tender Reference No.
515720813
πŸ“…
Publication Date
12 Mar 2025
πŸ’°
Estimated Value
USD 80000000
🌐
Sector
Renewable Energy
πŸ“…
Deadline
31 Dec 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Uzbekistan
πŸ“‘
Contract Duration
2 Years 9 Months 19 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
426
days remaining Β· 31 Dec 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority ACWA POWER BERUNIY WIND FE LLC
Country Uzbekistan
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…