📋 Tender Overview
scope The project includes the construction of 1800 linear feet of sidewalk from Holly Hill Drive to Vine Street. Existing curb and gutter will be reconstructed and new curb and gutter will replace 750 feet of currently open drainage. Signalized crosswalks will be added at the intersection with Vine Street.