Roadways Infrastructure and construction Bridges and Tunnels

New River Bridge Tender

🏛️ VIRGINIA DEPARTMENT OF TRANSPORTATION
📄 Tender ID: 456028254 📅 Published: 26 Aug 2020

📋 Tender Overview

scopeThis project will replace two bridges the northbound Interstate 81 bridge over the New River and the Route 232 bridge over I-81 at exit 105 Radford.The northbound I-81 bridge over the New River was built in 1965 and is showing signs of age. The new bridge will have an extended off ramp for exit 105 and wider shoulders.The new bridge over the New River is being built in the median next to the old structure so two lanes of northbound I-81 can remain open during construction. The Route 232 bridge crosses over the interstate and is being replaced to span the longer deceleration lane at exit 105 and wider shoulders on the new bridge over the New River. The bridge on I-81 was opened to traffic in 1965.

🔍 Key Information

📄
Tender Reference No.
456028254
📅
Publication Date
26 Aug 2020
💰
Estimated Value
N/A
🌐
Sector
Roadways
📅
Deadline
31 Dec 2026
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
6 Years 4 Months 5 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
43
days remaining · 31 Dec 2026
🔔 Set Alert

🧭 Quick Facts

Authority VIRGINIA DEPARTMENT OF TRANSPORTATION
Country United states
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…