📋 Tender Overview
Scope of Work:
New Humboldt 500 kV Substation with 500 kV line to Collinsville [HVDC operated as AC].
Description:
New Humboldt 500 kV station, with a 500/115 kV transformer, and a 500 kV line to Collinsville substation. The line is to be built for HVDC but initially operated as 500 kV AC. It will be complete in 2034.
Project Cost: $1,913M – $2,740M