π Tender Overview
Scope of Work:
To Build 1,100 MWac Shagaya Solar Power Project - Phase 1.
Description:
It is expected to be connected to the grid by 2027-28. The project is being tendered as an Independent Power Project (IPP) with MEWRE as the off-taker for the electricity generated. Studies indicate Kuwait could get fairly good LCOE (levelised cost of electricity) bids. Phase 1 of the Shagaya project will be 1,100 MWac (Megawatt, Alternating Current) and be fully based on photovoltaic (PV) solar technology.