Roadways Consultancy Roads and Highways

Multinational Kenya South Tender

🏛️ KENYA NATIONAL HIGHWAYS AUTHORITY KENHA
📄 Tender ID: 484865173 📅 Published: 22 Feb 2023

📋 Tender Overview

Project Summary
Approval Date 16 Dec 2022
Planned Completion Date 31 Dec 2027
Last Disbursement Planned Date 31 Dec 2027
Sovereign / Non-Sovereign Sovereign
Sector Transport
DAC Sector Code 21023
Commitment U.A 152,192,064.87
Status Approved


Project General Description

The Lesseru – Kitale (55km) and Morpus - Lokichar Road (138km) sections form part of the Lesseru – Nadapal – Kapoeta - Juba (945km) (Kenya- South Sudan) corridor, a strategic regional route, interconnecting Kenya and South Sudan. Indeed, the road corridor buttresses the regional transport network by linking the Northern Corridor at Lesseru with the Lamu Port South Sudan Ethiopia Transport (LAPSSET) corridor at Lokichar. Currently, due to the deteriorated condition of the road, transit traffic currently passesthrough the longer route via Uganda. The project will therefore significantly enhance connectivity within the Eastern Africa Region, connecting the project region to the northern parts of Kenya; linking landlocked South Sudan to a seaport; and boosting regional integration and trade. Because of resource constraints and lack of project readiness on the South Sudan side, Bank’s interventions will be addressed through a phased approach, to ensure the realization of regional benefits. Therefore, as a first step, the proposed project includes the provision of technical assistance (TA) to South Sudan, to enhance the country’s readiness to roll out the planned investments under phase II. On the Kenya side, the proposed Bank funded project will complement ongoing interventions financed by the World Bank, KfW and the European Investment Bank. The overall project cost estimate (net of taxes) including provisions for physical and price contingencies is UA 174 million.
Project Objectives

The project development objective is to improve transport connectivity between Kenya and South Sudan thereby deepening regional integration and trade and contributing to alleviation of fragility by providing a more efficient, safe and effective cross-border transport system. The specific objective of the project is to improve road transport along the Lesseru – Nadapal – Juba corridor (Kenya/South Sudan) by reducing travel time, travel cost and improving road traffic safety along the project road sections.
Beneficiaries

The project is located in the North-Western region of Kenya. As a multinational project the beneficiaries will be the traders, farmers, businesspersons and consumers in Kenya and South Sudan. In Kenya, the Lesseru – Kitale Road section traverses Uasin Gishu, Kakamega and Trans Nzoia Counties whose main economic activities are agriculture with horticulture (export growers), with wheat, tea, and coffee. According to the 2019 KPHC, the counties of Trans Nzoia and Uasin Gishu have a total population of over 2 million of which 50% are females. The Morpus - Lokichar road section traverses West Pokot and Turkana Counties, which represent one of the marginalized, rela

🔍 Key Information

📄
Tender Reference No.
484865173
📅
Publication Date
22 Feb 2023
💰
Estimated Value
N/A
🌐
Sector
Roadways
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
Kenya
📑
Contract Duration
4 Years 10 Months 9 Days

📁 Documents & Downloads

View All Documents →
# Document Name Type Action
1
T484865173.pdf
PDF

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
424
days remaining · 31 Dec 2027
🔔 Set Alert

🧭 Quick Facts

Authority KENYA NATIONAL HIGHWAYS AUTHORITY KENHA
Country Kenya
State / UT N/A
Tender Type Project Information