Energy, Power and Electrical Consultancy Infrastructure and construction

Multinational Ethiopia Djibouti Tender

πŸ›οΈ ETHIOPIAN ELECTRIC POWER EEP
πŸ“„ Tender ID: 468298889 πŸ“… Published: 29 Oct 2022

πŸ“‹ Tender Overview

Approval Date 07 Jul 2021
Signature Date 21 Jul 2021
Planned Completion Date 31 Dec 2026
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23630
Environmental Category 1
Commitment U.A 50,000,000
Status Implementation
Project General Description

The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (Β« Ethiopian Electric Power Β») and EdD (Β« Electricite de Djibouti Β»). It will be implemented over a period of 48 months.
Project Objectives

The ultimate development objective (DO) of the project is to increase power trade between Ethiopia and Djibouti and enhance regional integration in the Horn of Africa. The project will contribute towards the achievement of Djibouti’s climate mitigation commitments outlined in its Nationally Determined Contribution, specifically the construction of double circuit high voltage transmission lines with a combined capacity of 250 MW to import clean electricity from Ethiopia. The project supports the extension of the interconnector from Semera in Ethiopia side to Nagad in Djibouti to export additional power to the Djibouti National grid. This will enable e Djibouti to satisfy the growing energy demand in the country using relatively cheaper and c

πŸ” Key Information

πŸ“„
Tender Reference No.
468298889
πŸ“…
Publication Date
29 Oct 2022
πŸ’°
Estimated Value
N/A
🌐
Sector
Energy, Power and Electrical
πŸ“…
Deadline
31 Dec 2026
πŸ“
Notice Type
Projects
πŸ“
Location
Ethiopia
πŸ“‘
Contract Duration
4 Years 2 Months 2 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
59
days remaining Β· 31 Dec 2026
πŸ”” Set Alert

🧭 Quick Facts

Authority ETHIOPIAN ELECTRIC POWER EEP
Country Ethiopia
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…