Roads and Highways Bridges and Tunnels

Multi Track Bicycles Tender

🏛️ ROADS AND TRANSPORT AUTHORITY RTA
📄 Tender ID: 504089438 📅 Published: 22 May 2024

📋 Tender Overview

Scope of Work:
To Build 13.5 km multi-use track for bicycles, pedestrians which links Al Sufouh to Dubai Hills via Hessa Street.

Description:
This new track, which links Al Sufouh to Dubai Hills via Hessa Street, features two architecturally innovative bridges crossing over Sheikh Zayed Road and Al Khail Road. This track designated for cyclists, scooter riders and pedestrians is part of Hessa Street Improvement Project currently undertaken by RTA spanning 4.5 km between the intersections with Sheikh Zayed Road and Al Khail Road.

It encompasses upgrades to four major intersections along Hessa Street with Sheikh Zayed Road, First Al Khail Street, Al Asayel Street, and Al Khail Road. Hessa Street will be widened from two to four lanes in each direction, doubling its capacity to 16,000 vehicles per hour in both directions. The planned multi-use track measures 13.5 km in length and 4.5 metres in width (2.5-metre-wide track for cyclists & scooter riders, and 2-metre-wide track for pedestrians).

It connects Al Sufouh to Dubai Hills via Hessa Street. It serves 12 diverse residential, commercial, and educational areas in addition to service facilities in vibrant neighbourhoods like Al Barsha and Al Barsha Heights. The track is designed to improve connectivity for first and last-mile trips, linking with the Dubai Internet City Metro Station and other hotspots in the vicinity. The capacity of the track is estimated at 5,200 users per hour.

The new track features two uniquely designed bridges: the first spans 528 metres over Sheikh Zayed Road, and the second stretches 501 metres over Al Khail Road. Each bridge is 5-metre wide (3 metres for bicycles and e-scooters and 2 metres for pedestrians). The engineering design of these bridges is inspired by the surrounding environments. The design concept of the bridge crossing Sheikh Zayed Road embodies themes of connectivity embodied in overlapping lines. The open design of the bridge structure enhances visibility, offering improved views of the surrounding area and adjacent towers.

Meanwhile, the bridge over Al Khail Road has a design that replicates the path of the sunlight, creating smooth lines and offering pedestrians and cyclists a tranquil escape from the street noise. The design thoughtfully considers integrating the path of the sun's rays into the design.

🔍 Key Information

📄
Tender Reference No.
504089438
📅
Publication Date
22 May 2024
💰
Estimated Value
N/A
🌐
Sector
Roads and Highways
📅
Deadline
31 Dec 2026
📝
Notice Type
Projects
📍
Location
United arab emirates
📑
Contract Duration
2 Years 7 Months 9 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
45
days remaining · 31 Dec 2026
🔔 Set Alert

🧭 Quick Facts

Authority ROADS AND TRANSPORT AUTHORITY RTA
Country United arab emirates
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…