📋 Tender Overview
Description:The Moraga Road and Canyon Road Complete Streets Project will be implemented along Moraga Road between St Mary's
Road and Moraga Way, and Canyon Road between Moraga Way and Sanders Drive, within the PDA in Downtown Moraga.
Based on conceptual plans, the project scope is currently estimated to add 1233 LF new sidewalks, replacing/repairing
1872 LF nonconforming sidewalks, installing 14 ADA-accessible curb ramps, 12 Solar-powered Rectangular Rapid Flash
Beacons (RRFBs), intersection timing with leading pedestrian intervals, 4 median pedestrian crossing noses, 4600 LF
enhanced Class II bike lanes with buffer zones, pavement renovation, 25 street trees along new sidewalk, 3 new bus stop
shelters with people-friendly benches and solar-power-compacted garbage bins, speed feedback signs, and other
necessary improvements. The improvements will tie into previously constructed and future projects providing continuous
safe routes for the residents of outlying rural areas connecting low-income residents to the schools and services within
Moraga and provide improved access to active transportation modes.