Consultancy Infrastructure and construction Bridges and Tunnels

Metro Manila Bridges Tender

πŸ›οΈ DEPT. OF PUBLIC WORKS AND HIGHWAYS
πŸ“„ Tender ID: 468427859 πŸ“… Published: 11 Apr 2022

πŸ“‹ Tender Overview

Source of Funding / Amount: Loan 4168-phi: metro manila bridges project
Ordinary capital resources: US$ 175.10 million

The proposed loan (the project) will finance the construction of 3 new bridges crossing marikina river as part of the governments effort to solve the increasingly severe traffic problem of metro manila, the national capital region (ncr) of the philippines. The project will include a component to strengthen the capacity of the executing agency in planning, design, management, and operation and maintenance (o&m) of bridges and crossing structures using a holistic approach, including by factoring climate change and disaster risk considerations.
The continuous economic development and urbanization in metro manila has brought along heavy traffic congestion that causes substantial loss of time and opportunities for commuters and businesses, respectively. With a total road length of 4,882 km (1,159 km national roads and 3723 km local roads), metro manila has a well-articulated trunk road network comprising radial (r-1 to r-10) and circumferential (c-1 to c-5) in its metropolis, with interchanges providing grade separations at several intersections of the trunk roads. However, the current traffic demand of 12. 8 million trips per day is overwhelming the capacity of the road network. Metro manila nowadays only has 1 km of road per 424 motor vehicles, and majority of commuters in metro manila travel at 10 km per hour on average. It was estimated that the country lost php 3. 5 billion per day in 2017, due to metro manila traffic, and the loss was projected to be php 5. 4 billion per day in 2035 if no action is taken. One of the major factors contributing to the inefficiency of metro manilas road network is the inadequate capacity of the existing 30 bridges crossing its major waterways, namely pasig river, marikina river and manggahan floodway. These bridges currently accommodate 1. 3 million vehicles per day. The traffic survey conducted by the department of public works and highways (dpwh) during december 2016-january 2017, shows that (i) the overall level of service of the bridges crossing pasig river is _f_, which means _forced or flow breakdown_, and (ii) the overall level of service of the bridges crossing marikina river and manggahan floodway is _e_, which means _operation at or near capacity and an unstable level_. Therefore, it is critical that additional crossing structures are built over these waterways to decongest the existing bridges, hence mitigating the risk of overloading them. This will help extend the life of existing bridges and reduce their maintenance cost. In line with the governments roadmap for transport development for metro manila and its surrounding areas to alleviate the traffic congestion in metro manila (footnote 2), partly caused by the constrained capacity of the existing bridges, and the strategic framework to accelerate infrastructure development in the philippine development plan 2017-2022, the proj

πŸ” Key Information

πŸ“„
Tender Reference No.
468427859
πŸ“…
Publication Date
11 Apr 2022
πŸ’°
Estimated Value
USD 247500000
🌐
Sector
Consultancy
πŸ“…
Deadline
30 Jun 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Philippines
πŸ“‘
Contract Duration
5 Years 2 Months 19 Days

πŸ“ Documents & Downloads

View All Documents β†’
# Document Name Type Action
2
T468427859.html
HTML

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
240
days remaining Β· 30 Jun 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority DEPT. OF PUBLIC WORKS AND HIGHWAYS
Country Philippines
State / UT N/A
Tender Type Project Information
Currency USD