📋 Tender Overview
Scope of Work:
Construction of 150-megawatt Cumberland Solar Facility.
Description:
The Cumberland Solar Facility is anticipated to be a catalyst for job creation, with projections indicating the generation of 150 local positions during the construction phase. Additionally, the project aims to inject $25 million in direct onsite wages into the local economy.
Scheduled to commence construction in 2028 and reach commercial operation by 2030, the 150 MW solar farm is poised to supply over 300,000 megawatt-hours of renewable electricity annually. This output is expected to power more than 37,500 average households in Virginia, while simultaneously offsetting approximately 138,800 tons of carbon dioxide emissions per year equivalent to eliminating emissions from over 30,000 passenger vehicles annually, according to the U.S. Environmental Protection Agency (EPA). The approval of the Cumberland Solar Facility marks a significant milestone in the pursuit of sustainable energy solutions for Central Virginia, promising tangible economic benefits and environmental gains for the region and beyond.