Renewable Energy Consultancy Infrastructure and construction

Med Wind Floating Tender

πŸ›οΈ RENEXIA
πŸ“„ Tender ID: 486205351 πŸ“… Published: 23 Mar 2023

πŸ“‹ Tender Overview

Location : Strait of Sicily, Italy

The Med Wind Floating Offshore Wind Park is proposed to be developed in the Strait of Sicily in the Mediterranean Sea.

The 2.8GW wind park is expected to generate around 9 Terawatt hours (TWh) of electricity, enough to power more than three million Italian households. This will reduce carbon dioxide emissions by 2.7 million tonnes.

Renexia, a subsidiary of Toto Group, is the developer of the Med Wind Floating Offshore Wind Park.

The construction phase of the project is expected to commence by 2025, subject to receiving all permits. The commercial operations are slated to begin on 1 January 2026.

Location and Site details

The Med Wind Floating Offshore Wind Park will be located in the Strait of Sicily. The location will be around 60km from the Italian coast.

The wind park will cover an area of 850km2.
Project details

The Med Wind Floating Offshore Wind Park will be situated offshore in a region where the depth of the seabed ranges 300m-600m.

The project will comprise 190 floating wind turbines.

Each wind turbine will have a power generating capacity of 14.7MW. The turbines will have cameras and radars installed to track and record the movements of cetaceans in the Mediterranean Sea and for monitoring the paths of the migratory birds.

The maximum overall height of the wind turbines will be 256m.

The wind turbine structures will be fixed with an advanced anchoring system instead of securing them to the seabed. This will help in reducing the environmental impact.

The wind farm layout was also selected to ensure minimum impact on the environment and on human activities.

Additionally, the facility will feature tailored resting spots for migratory birds, while the floating bases of the wind turbines are expected to gradually transform into artificial reefs to attract molluscs and small fish that feed on plankton.

The electricity generated by the farm will be collected by offshore substations and evacuated through export cables.

Once in the production phase, the Med Wind Project will enable the closure of three plants that are contributing to climate change.
Contractors involved

In September 2022, Fugro secured a survey contract for the Med Wind Floating Offshore Wind Park by Renexia.

Under the terms of the contract, Fugro will provide detailed marine geophysical and environmental surveys to collect comprehensive geo-data for the project and along the two proposed export cable corridors.

In December 2022, Renexia selected Technip Energies for Front-end Engineering and Design (FEED) works of the wind park. The scope of the contract includes FEED for 190 floating foundations and moorings for the wind turbines and conceptual design for the floating offshore substations.

According to Technip Energies, the design of the floating foundations of the offshore wind park will be based on its floater technology INO15.

INO15 is a three-column semi-submersible floater

πŸ” Key Information

πŸ“„
Tender Reference No.
486205351
πŸ“…
Publication Date
23 Mar 2023
πŸ’°
Estimated Value
N/A
🌐
Sector
Renewable Energy
πŸ“…
Deadline
31 Dec 2026
πŸ“
Notice Type
Projects
πŸ“
Location
Italy
πŸ“‘
Contract Duration
3 Years 9 Months 8 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
59
days remaining Β· 31 Dec 2026
πŸ”” Set Alert

🧭 Quick Facts

Authority RENEXIA
Country Italy
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…