📋 Tender Overview
Proposed Project
The Overall Development Objective (ODO) of the proposed
project is to rehabilitate the parallel taxiway systems for
runway 3/21. This will be Phase 2 of the overall taxiway
system rehabilitation.
CY 2017: Preliminary Engineering Report.
CY 2025: NPE funded Design Only.
CY 2026: Construct ODO.
Project Justification
The Commission's pavement management system forecasts a PCI rating of 64 for the parallel taxiway system to RW 18/36 in year 2019. The parallel taxiway system to RW 3/21 is in a similar state of deterioration. Since the PCI rating of the parallel taxiway system pavements will be near 65 (the threshold PCI value below which the pavement typically experiences rapid deterioration), it is more cost effective to rehabilitate the pavement in its current condition than to let it continue to deteriorate to a condition that would require more extensive repairs and/or reconstruction.
Airport Information
• Regional Business Airport
• Based Aircraft & Operations: 107 (5 jets) & 48,700
• Runway 17/35: 5,199' x 100'
• Runway 03/21: 4,748' x 100'