📋 Tender Overview
Description:The Project will construct a three-way signal-controlled intersection at the St. Mary's Rd/Rheem Blvd intersection, a
designated left-turn pocket with optional traffic signal at the St. Mary's Rd/Bollinger Canyon Rd intersection, and
modifications to roadway alignment. Rheem Blvd will be widened in order to construct a Class II bike lane, which will
connect to a Class I shared-use path along St. Mary's Rd