📋 Tender Overview
Scope of Work:
Martin-Millbrae 60 kV Area Reinforcement Project.
Description:
The Martin-Millbrae 60 kV system is located in the Peninsula division of the Greater Bay area and serves approximately 23,000 customers through the Martin, Millbrae, Sneath Lane, Pacifica, San Andreas and Bruno 60 kV substations. Two 115/60 kV transformers banks located in Martin and Millbrae with a capacity of 110 MVA and 100 MVA, respectively, provides service to these areas. The load forecast indicates high load growth in this area due to multiple business load requests resulting in PG&E planning to expand the load serving capacity by upgrading the distribution banks at Sneath Lane substation. As a result of the increased demand there were overloads observed on the Martin-Sneath Lane and Millbrae-Sneath Lane 60 kV lines upon loss of either the Millbrae or Martin 115/60 kV transformer banks in the 2023-2024 TPP reliability assessment. This project mitigates the NERC TPL-001-5 Category P1 violations. It will also increase the load-serving capability and customer reliability in the area. If the load growth persists at the same rate in this region, considering the electrification trend, it may be necessary to expand the project scope to accommodate long-term load projections in future planning cycles.
The ISO recommended approval of the Martin-Millbrae 60 kV Area Reinforcement Project which includes the following elements: Reconductor 7.2 circuit miles between the Martin and Sneath Lane Substation with a larger conductor to achieve at least 1100 Amps during summer emergency conditions and 1200 Amps during winter emergency conditions; Reconductor 2.5 circuit miles between the Millbrae substation and 012/078, and between 014/093 and Sneath Lane on the Millbrae-Sneath Lane 60 kV line with a larger conductor to achieve at least 1100 Amps during summer emergency conditions and 1200 Amps during winter emergency conditions; and Upgrade any limiting components as necessary to achieve the full conductor rating. The total estimated cost of this project is $20M - $40M. The expected in-service date of this project is May 2030.