the FAA initially would only cover 100 feet of the 150-foot-wide runway, but the final plans take care of the full runway. Keazer said it was important to have all 150 feet redone that they need for large charters.
The plan is to lay a 5-inch asphalt base after the pavement is rubblized, then crews will apply a 10.5-inch concrete surface. Other outside sections will get a 12-inch surface with no base. The plan also calls for the reconstruction of the secondary runway, as well as adjacent intersections and five taxiways. One taxiway will be removed because of a change in FAA design standards, according to Keazer, and more lights and navigational aids will be placed along the runway.