📋 Tender Overview
Project Description: The sanitary sewer portion of this project involves evaluating the sewer prior to construction, and in-situ relining and repairs will be performed as required based on condition assessment. The storm sewer portion of this project involves replacing approximately 760 metres of storm sewer pipe, a total of 8 manholes, 1 water quality unit, 1 outfall structure, and 24 catch basins. A total of 24 lateral service connections will be installed. The watermain portion of this project involves replacing the existing watermain with approximately 760 metres of watermain. A total of 24 water services and 6 fire hydrants will be replaced. Concrete curbs, concrete sidewalks, and paved roadways will be installed as part of the reconstruction. Design to commence in 2025, with construction in 2026.