📋 Tender Overview
The dam site is on Sondu River near Magwagwa town and the project is estimated to cost Kshs. 86.8 billion. The project covers 5 counties namely: Bomet, Kericho, Nyamira, Homabay and Kisumu.
The Expected Outputs
95m high and 450m long dam with live storage capacity of 445 million m3
120 MW of hydropower giving energy production of 570 GWh/yr.
33km 132KV Transmission Line
13,807 ha irrigated land in Kano/Nyakach plains (Phase 1: 3,063 ha)
Water supply infrastructure to people in surrounding towns
Buildings, Roads and other infrastructures