Project Description
The Overall Development Objective (ODO) of the proposed project is to construct a new 4,000 ft. x 75 ft. runway approximately 240 ft. east of the existing runway.
CY 2025: Preliminary Engineering Report.
CY 2027: NPE Funded Design Only.
CY 2028: Construct ODO.
Project Justification
This project consists of constructing a new runway approximately 240 ft. east oft he existing runway. Based on the airport's recently completed planning study, the existing runway does not meet standards due to its proximity to the hangar and terminal area. In addition there is rising terrain towards the hangar and terminal area which would inhibit the ability to construct a parallel taxiway that meets standards. The planning study also identified traffic demand to support the airport's reference code changing from B-I to B-II.
Airport Information
• District Airport
• Based Aircraft & Operations: 21 & 4,000
• Runway 18/36: 3,005' x 60