📋 Tender Overview
Scope : To construct the 104-MW Lower Seti (Tanahu) Hydropower Project in Nepal
Tanahu Hydropower Ltd is going to construct the 104-MW Lower Seti (Tanahu) Hydropower Project. The water for generating power from this project will be received from a 140-meter tall concrete dam in the Seti River of Tanahu Hydropower Project and additional flow from the Madi River.
Previous Events:
After completion of the field investigation works, the Consultant has submitted the draft design report and bidding documents during the first quarter of 2021. As per the agreed plan with the ADB, THL has appointed international Panel of Experts (POE) for the independent review of design documents submitted by the Consultant. The POE has commenced the services and has so far submitted the first draft design review report to the THL.
12 April 2019: TANAHU HYDROPOWER LIMITED (THL) signed a Contract Agreement with JV of WAPCOS Limited, India and Nippon Koei Co. Ltd, Japan on for the Detail Engineering Design and Preparation of Bidding Documents of the project.
11 April 2018: Detailed Engineering Study and Preparation of Bidding Documents of Lower Seti (Tanahun) Hydropower Project, Bid closing: 25 May 2018.
12 November 2017: The Department of Electricity Development (DoED) has granted the licence to construct the Lower Seti hydropower project in Tanahu district with generation capacity of 104 megawatts to Tanahu Hydropower Ltd (THL). THL is a subsidiary company of Nepal Electricity Authority.