📋 Tender Overview
Project : ENV-001-08
Project Description : The project was established for repairs to the particular facility and other LRWRP capital related costs. It is funded from the dedicated Pollution Control Reserve, Fund 208. The account represents funding for various works including placeholders for planned and unplanned repairs on a year-by-year basis. The work anticipated and completed varies annually dependent on manpower, project scope and can span several years. Due to the large amount of mechanical, electrical and structural infrastructure in the facility, annual funding from the Sewer Surcharge was put in place in order to address the depreciation of this infrastructure and provide for ongoing replacement, rehabilitation and repair. This ensures the reliability and integrity of the infrastructure in order to properly maintain the operation due to its critical nature. The facility has redundancy designed and built-in so that when equipment requires repair it can be taken out of service and still maintain the overall facility capacity. However, the repair must be completed in a timely manner in order for it to be brought back into service to ensure the reliability and integrity of the overall operation. Significant portions of the equipment are at what is considered to be its normal life span (15 to 40 years), dependent on the type of equipment. As a result, it is scheduled to be replaced as preventative maintenance prior to failure.