Duration 01-MAR-2021 to 31-AUG -2027Total budget 14547148.00 EU contribution 8728288.00 Project descriptionBackgroundIn Sweden as in most other Member States semi-natural habitats dependent on traditional agricultural management practices e.g. grazing and hay cutting have suffered from serious deterioration during the last century. The decline has been driven by changes in land-use practices as well as by socio-economic factors. In northwest Europe most of these areas have been turnedinto intensively managed farmland abandoned or turned into forest. As a result only a small fraction of the original area remains. Among the habitats listed in Annex I of the EU Habitats Directive most of those dependent on traditional management practices belong to the group with the poorest conservation status they also have a negative trend across the whole of Europe.ObjectivesThe objective of LIFE RestoRED is to restore to favourable conservation status the Annex I-listed semi-natural habitats that are included in the European Red List of Habitats. The project aims to use its actions as examples which can enhance restoration of semi-natural habitats in the wider landscape.The specific objectives are to Restore almost 1 150 ha including more than 870 ha of Annex I habitats with unfavourable status plus an additional 270 ha not currently of Annex 1 habitat quality but where restoration and subsequent management will lead to their reaching habitat quality Disseminate and share knowledge and experience on the ways in which these sites as well as other areas in the wider landscape can be restored and sustainably managed long term Create conditions that will facilitate long-term sustainable management of the target habitats and sites e.g. by adding fencing installing water supplies and by aiming for the sites to be eligible for environmental subsidies through restoration and Integrate management favouring pollinators in as many of the target habitats as possible to improve the situation for these species and raise awareness.ResultsExpected results Over 870 ha of 17 Annex I habitats restored plus an additional 270 ha of land not currently classified as Annex I habitat but expected to achieve suitable conditions for developing to this quality due to the projects measures Construction of new fences and other infrastructure water corrals. The 90 km of new fencing will take account of future resilience in the planning and size of grazing areas allowing flexibility for the future 118 gates installed for visitors and livestock management Planting of over 90 trees and 500 bushes and provision of a water supply at four sites A rangeof management actions undertaken favouring pollinators and raising awareness of their importance Hydrological restoration carried out at three sites Almost 12 km of paths put in place Most of the land restored to a l
π Key Information
π
Tender Reference No.
461715624
π
Publication Date
17 Apr 2021
π°
Estimated Value
USD 17431819
π
Sector
Banking, Finance, Insurance and Securities (BFIS)
π
Deadline
31 Aug 2027
π
Notice Type
Projects
π
Location
Sweden
π
Contract Duration
6 Years 4 Months 14 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.