Water and Sanitation Infrastructure and construction Environment and Pollution

Life Moor Space Tender

🏛️ NATURAL ENGLAND
📄 Tender ID: 470886232 📅 Published: 05 Mar 2022

📋 Tender Overview

Start Date: 01/10/2021
End Date: 31/12/2026
Total Budget: 2,438,943 €
EU Contribution: 1,463,365 €

PROJECT DESCRIPTION
BACKGROUND
Lowland raised bog is one of Western Europe’s rarest and most threatened habitats. The Thorne Moor Special Area of Conservation (SAC) in South Yorkshire, part of the last remnants of a large wetland that occupied the Humberhead Levels floodplain thousands of years ago, is the largest area of lowland raised bog in England. The SAC is rich in many active raised bog species e.g. bog mosses, Sphagnum species and cotton grasses (Eriophorum angustifolium). Located on the boundary of the north/south range of many plant and invertebrate species, the site supports species such as the Thorne pin-palp beetle (Bembidion humerale), found nowhere else in the UK and rare in Europe.

LIFE Moor Space will build on the THAT’S LIFE (LIFE13 NAT/UK/000451) project. THAT’S LIFE started the reversal of the SAC’s condition, addressing many of the conservation issues described in the site improvement plan (SIP). Since this project ended the remaining issues are:
Drainage: peat cutting and drainage for agriculture has negatively impacted water levels on the SAC and dried the peat;
Scrub (with some invasive alien species, i.e. rhododendron) is continuing to thrive on the drier private land within the SAC;
Increased nutrients/pollution, mainly from surrounding agriculture practices; and
Climate change: increasingly wet winters/drier summers create a challenge to maintaining optimum hydrological conditions.

As England’s largest lowland raised bog, restoration of the Thorne Moor SAC will make a significant contribution to the conservation status of this habitat in the UK and Europe.

OBJECTIVES
LIFE Moor Space will restore and improve the hydrological continuity and conservation status of more than 1,800 ha of degraded raised bogs and active raised bogs within the Thorne Moor SAC. The project will address the remaining threats at the SAC and SIP actions developed through the LIFE IPENS project (LIFE11 NAT/UK/000384 - Improvement Programme for England’s Natura 2000 Sites).
The specific objectives are to:
Restore 400 ha of degraded bog, securing the long-term future of more than 1,800 ha of SAC habitat by:
Acquiring 80 ha of SAC land, currently in up to 9 separate blocks, to enable coherent water level management across 400 ha;
Removing scrub/trees to reduce evapo-transpiration; removing invasive species (rhododendron);
Restoring water levels on new acquisitions and adjacent land to optimum levels (around 20 cm); planting Sphagnum species to create and stimulate peat-forming vegetation to re-colonise within a 5-year period; preparing a Wildfire Management Plan addressing climate resilience;
Work in partnership with 25 land managers within, and adjacent to, the SAC, providing practical advice, training and support to identify alternative funding that delivers land uses that wor

🔍 Key Information

📄
Tender Reference No.
470886232
📅
Publication Date
05 Mar 2022
💰
Estimated Value
USD 2667003
🌐
Sector
Water and Sanitation
📅
Deadline
31 Dec 2026
📝
Notice Type
Projects
📍
Location
United kingdom
📑
Contract Duration
4 Years 9 Months 26 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
42
days remaining · 31 Dec 2026
🔔 Set Alert

🧭 Quick Facts

Authority NATURAL ENGLAND
Country United kingdom
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…