📋 Tender Overview
€ 200.3 million
Ongoing
https://llwdp.co.ls/
info@llwdp.co.ls
The Ministry of Water
European Investment Bank (EIB)
€ 41 million
Blending facility - 11th EDF under the Africa Investment Plan
01.04.2020
19.11.2027
The objective of this project is to ensure that populations of the Lowlands regions in Lesotho have access to safe drinking water and basic sanitation in line with the country's Vision 2020" strategy. The project operates in the main towns of Maputsoe, Hlotse, Mafeteng and Mohale’s Hoek.
Project overview
The main objective of this project is to improve secure access to water and sanitation in four priority geographical zones (2, 3, 6 and 7) in the Lowlands Region of Lesotho, corresponding to the main towns of Maputsoe, Hlotse, Mafeteng and Mohale’s Hoek and surrounding towns. A secondary objective is to ensure the inclusive socio-economic and climate-resilient development of the Lowlands Region.
The Action consists of two components: i) the development of infrastructure for increased and reliable potable bulk water supply and sanitation services, and ii) strengthening the institutional capacity of local water authorities to operate and maintain the infrastructure. By providing sustainable water supply services to the population, the project will also help the service providers to better cope with climate change impacts in the project areas.
The project blends financing from four main sources. An EU grant of EUR 41 million is complemented by a loan from the European Investment Bank (EIB) of EUR 82 million. The Government of Lesotho contributes EUR 10.2 million to the project and the World Bank contributes a loan amounting to EUR 67.1 million loan.
Sector
Water
Context
This is the second phase of the larger Lesotho Lowlands Water Supply Scheme (LLWSS). The first phase, known as the Metolong Dam and Water Supply Programme (MDWSP), was also co-financed by the EIB. The MDWSP included the construction of the 83-meter high Metolong Dam, the construction of water treatment works and advancing the supporting infrastructure. The Dam already provides safe drinking water to the country's capital, Maseru, and other major towns north and south of it such as Teyateyaneng and Roma.
The preparation of the LLWSS started under the 9th EDF with technical assistance from the EU that developed the original design for the provision of bulk water to the entire Lowlands Region. This technical assistance resulted in the preparation of feasibility studies, designs and tender documents for the eight zones forming the Lowlands Region by the Lowlands Water Joint Venture in 2008. A water resources study also funded by the EU identified the least-cost, long-term solution for bulk supply to Maseru and the surrounding Lowlands Region (covering part of zones 4 and 5), what is known as the Metolong Dam and Water Supply Programme (MDWSP) - LLWDP Phase I.
Moreover, in 2008, the European Investment Bank, the European Union through its Water Fa