Scope :
The Lahmeyer Rukwa Power Plant is 360MW coal fired power project. It is planned in Rukwa, Tanzania. It will be developed in multiple phases. The project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2026.
Description
The project is being developed and currently owned by Edenville Power Tanzania. The company has a stake of 100%.
It is a Steam Turbine power plant. The fuel will be procured from Mkomolo and Namwele Coal Mines.
The thermal power project consists of 2 turbines each with 60 MW nameplate capacity and 2 turbines each with 120 MW nameplate capacity respectively.
Development status
The project construction is expected to commence from 2025. Subsequent to that it will enter into commercial operation by 2026.
Contractors involved
Sinohydro is expected to render engineering procurement construction services for the coal fired power project.
π Key Information
π
Tender Reference No.
489370085
π
Publication Date
06 Jun 2023
π°
Estimated Value
N/A
π
Sector
Non-Renewable Energy
π
Deadline
31 Dec 2026
π
Notice Type
Projects
π
Location
Tanzania, united republic of
π
Contract Duration
3 Years 6 Months 25 Days