Scope :
Kozjak Substation is a 400/220kV substation located at Kozjak, Mislinja, Slovenia. The substation is proposed and is expected to be commissioned in 2028. The Kozjak Substation will be operated by ELES doo.
The designed voltage level of the substation is 400/220kV and the operating voltage level is 400/220kV. The step in voltage of the project is 400kV and the step out voltage is 220kV.
Kozjak Substation is owned by ELES doo
๐ Key Information
๐
Tender Reference No.
507076649
๐
Publication Date
10 Aug 2024
๐ฐ
Estimated Value
N/A
๐
Sector
Energy, Power and Electrical
๐
Deadline
31 Dec 2028
๐
Notice Type
Projects
๐
Location
Slovenia
๐
Contract Duration
4 Years 4 Months 21 Days
๐
Documents & Downloads
No documents found
๐ท๏ธ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.