📋 Tender Overview
Description: Funding from this project is used for the renewal of existing 'building and general' Tourist Park assets in line with the Gold Coast Tourist Parks Asset Management Plan. Assets, as listed within the Tourist Parks Asset Register, are reviewed annually for Level 1 condition assessment and budgets and programs are based on end of life (determined as combination of both technical and customer service levels). Lower renewals funding required in later years due to proposed changes which will see Park returned to full Tourist use. As such renewals of assets which will be upgraded through a separate budget request have been removed. Renewals include fencing, pole, prepared surface, utility supply unit and repainting a number of villas. For 2022-23 the renewal programs across all the Tourist Parks have been restructured and re- programmed with targeted renewal initiatives for 2022-23 including utility assets and building refurbishment works including villa's, ensuites, air-conditioning units and hot water units, caravan/ motor-home powerheads, annexure slabs, shade sails across the parks.