📋 Tender Overview
Project ID : 53312902
Project Description and Rationale : In 2009, the Class Environmental Assessment for the Kerr Street Grade Separation was completed. The town is now working with Metrolinx to deliver the grade separation through a separate project which terminates at Wyecroft Road. This project is to provide infrastructure that is complementary to the grade separation but is outside of the scope of work as agreed to with Metrolinx. In 2021, a cul-de-sac will be constructed off Wyecroft Road to provide access to 656 and 700 Kerr Street (required as a result of the grade separation construction). In 2029, road works from Wyecroft north to the North Service Road will be constructed (widen to 4 lanes) in accordance with the 2009 Class EA.