📋 Tender Overview
Project Description: The Kenesserie Road over Grant Drain Rehabilitation Project consists of rehabilitation of the existing concrete culvert. This project includes shallow concrete patch repairs, waterproofing of the deck, installation of sloped rip-rap erosion protection, and reinstatement of the granular road surface. This project will be in the design stage in 2025 with anticipated tender between April and June 2026, with the 2-year construction timing window beginning July 2026 until December 2027.