Kelowna International Airport Tender

πŸ›οΈ CITY OF KELOWNA
πŸ“„ Tender ID: 506006837 πŸ“… Published: 11 Jul 2024

πŸ“‹ Tender Overview

Scope :
The Kelowna International Airport terminal expansion project is expected to be completed in 2026.
Kelowna International Airport, operated by the City of Kelowna, is in British Columbia (BC), Canada. The airport handled more than 1.7 million passengers in 2022.

The airport unveiled plans for an air terminal building (ATB) expansion project in December 2019 to meet the growing passenger traffic, which is expected to reach 3.5 million a year by 2045.

The expansion will increase capacity by utilising existing and new spaces efficiently and minimising environmental impact and costs. It is crucial for maintaining air services and boosting the regional economy.

The terminal expansion is being undertaken in two phases. Enabling works for the phase one expansion commenced in 2022 while construction began in September 2023.

Phase one of the expansion is scheduled to be completed in 2026 while construction on phase two will begin in 2036.
Kelowna International Airport terminal expansion details

The two-phase expansion of the Kelowna International Airport terminal is being undertaken at the southern end of the airport.

The first phase of the project will extend the terminal by approximately 5,590mΒ² (60,170ftΒ²) and refurbish 1,200mΒ² of the existing building. The existing roof of the terminal will be replaced as it has reached its end of life.

The expanded terminal will feature an extended departure lounge to enhance the passenger experience and offer improved food and beverage choices. In addition, the pre-screening checkpoints will be extended to increase the capacity and improve efficiency using technology.

The expansion will result in new direct access to several gates for both departing and arriving passengers through improved wayfinding.

Phase two of the expansion will further expand the terminal building and shift the domestic arrivals area towards the south, apart from adding a new domestic baggage claim space.

The existing arrivals area will be repurposed to expand the international arrivals area and Canada Border Services Agency (CBSA). In addition, the departures lounge will be further expanded to boost capacity, and the rental car, shuttle and tourism booths will be relocated.
Terminal building roof design at Kelowna International Airport

The Kelowna International Airport terminal building’s roof will be replaced with 4,460mΒ² of new roofing. The new waffle roof structure will be made of mass timber and resemble the existing concrete waffle slab roof. It will feature a waterproof membrane, as well as improved insulation to enhance energy efficiency.

The waffle structure will comprise a series of prefabricated cross-laminated timber (CLT) panels supported by glulam-style girders cantilevered 5m in the north-south direction. The girders will span 20m above steel columns extending from the main floor.

The CLT panels will cover up the lights and utilities present inside the roof such as sprinklers, co

πŸ” Key Information

πŸ“„
Tender Reference No.
506006837
πŸ“…
Publication Date
11 Jul 2024
πŸ’°
Estimated Value
USD 66000000
🌐
Sector
Aviation
πŸ“…
Deadline
31 Dec 2026
πŸ“
Notice Type
Projects
πŸ“
Location
Canada
πŸ“‘
Contract Duration
2 Years 5 Months 20 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
58
days remaining Β· 31 Dec 2026
πŸ”” Set Alert

🧭 Quick Facts

Authority CITY OF KELOWNA
Country Canada
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…