📋 Tender Overview
STIP ID:4347(006)
Total Project Length:0.690
Begin Termini:NE 68th Street
End Termini:NE 78th Street
Description:As needed, major items of work include replacing concrete slabs, addressing substandard ADA ramps, up-grading ADA pedestrian push buttons
at signalized crosswalks, restriping, and upgrading signage