📋 Tender Overview
Scope of Work:
Jabel Ali Sewage Treatment Plant (Phase 3) Extension, Jebel Ali, Dubai.
Description:
The scope of work involves the studies, which include submitting a report on existing Phase 1 and 2 known issues with rectification recommendations and P-Removal capacity analysis, Lessons Learned Report and recommendations on designs used in Phase 1 and 2, Inlet and Outlet Flow Profile Report and database. Inlet Water Quality analysis, optimisation for BioWin influent specifier, Report on existing BioWin Models for Phase 1 and 2, BioWin Model for Phase 3, Project Management.
The scope also includes consultancy services for preliminary design, preparation of tender documents, Engineering, Procurement and Construction (EPC) prequalification and tendering, cost estimation, PPP tender documents and contract preparation. The overall project is slated for completion by the fourth quarter of 2026, estimate of the project cost is $120 million.