π Tender Overview
Project ID: P169548
Region: East asia and pacific
Commitment Amount: Us$ 500.00 million
Total Project Cost: Us$ 710.00 million
To improve urban mobility and accessibility on high priority corridors in selected urban areas of Indonesia and strengthen instituti onal capacity for mass transit development.
The proposed project will provide technical assistance and financing support for the first phase implementation of IMTPin selected cities. The project will focus on two priority metropolitan areas, namely Bandung metropolitan area and Medan metropolitan area. The total cost of the project is estimated up to US$710 million, with US$500 million loan from the IBRD, and the remaining GOI co-financing. It is proposed that the project would have two main components, namely: institutional development and capacity building; and support for implementation of safe, resilient, green, and integrated mass transit in selected cities.3.Component 1: Institutional Development and Capacity Building(US$70 million). This component will provide support for roll out and implementation of the ITMP and will include project management, together with institutional support and capacity at national and subnational levels.4.Sub-component 1A: Project Management (US$10 million).The project will support project management for: A national Project Management Unit (PMU) to manage the implementation of the first phase of the national program; andThe Establishment and operation of sub-national Project Implementation Units (PIUs) in each of the first phase cities to manage the planning, procurement (including PPP and Transaction Advisory services) and implementation of mass transit systems in each city.5.Sub-component 1B: National-level institutional support and capacity building (US$30 million). At the national level the project will support: Relevant assessments and studies to assist MoT and Bappenas to develop a pipeline of cities for subsequent implementation of mass transit systems in accordance with RPJMN priority;Development of guidelines, procedures and systems required to implement and manage the IMTP;Institutional development and capacity building of a Technical Secretariat to take over the functions of the PMU for long-term management of the IMTP to ensure sustainability of the program.