📋 Tender Overview
Project :ENG-002-16
Project Description : The Little River municipal drain is the stormwater outlet for 33% of the City’s surface area. The section from Lauzon Road to the VIA Rail right-of-way was improved to the current cross-section in 1975. A report exploring options for this section of the river using natural channel design techniques to create a sustainable river corridor was completed in 2012. The intended design features and plantings would create a more sustainable river corridor and control sediment with an off-line pool. A formal Environmental Assessment process including public consultation was conducted in 2023. On completion of the EA, implementation is required and is proposed as part of this program. Design and construction may be phased depending on available funding.